3-4 months is the normal build time here. I am going to go take a picture of a house they just started near me and then see how long it takes. I will post the pictures to you so it can enhance your suffering.
Oh Shut up. It will probably be done before mine is.
"Spec homes" usually take 3-4 months to build.
I drive by places that are building new spec houses. One day there's no roof. The next day, there's a roof. One day there's just framing. Next day there's walls. Next day there's bricks. I'm thinking "WTF, why does my house take 20 times longer".
But then I console myself by thinking, most of these Spec homes are 1500SF with 8' ceilings and mostly carpet flooring.
Almost everything about my house is weird or different. Like 20A circuits throughout the house, instead of 15A. Three 20A circuits for theater room.
All porcelain floors for 5400SF + rocks for some walls.
Light switches are Wi-Fi switches.
2 Kitchens, instead of 1.
7 A/C Zone + 7 Wi-Fi Radio Thermostats.
Whole-house Back-up Generator.
The concrete around my house (driveway, sidewalks) is $45,000.
One of the local artists came by the house yesterday to paint our Study Room Dome Ceiling with fancy artwork, instead of just regular paint like most houses.
But still, I was hoping it would be completed by 8 months, not 10-11 months.