Last system I will ever need to own

  • Thread starter Thread starter AcuDefTechGuy
  • Start date Start date
We don't do a lot of swimming but it adds a beautiful finish to your backyard. We do float around and drink alcohol which is fun.

Pool Maintenance? I spend maybe 5 minutes 2 days a week on maintenance which is checking the chemistry and hitting button on my phone if something is off. Maybe once a week I empty out the skimmers and vacuum basket. The vacuum is also initiated by a button on my phone.

Twice a year I change out the DE in the filter. My pool builder will do it for $130 but I normally do it myself. I did it yesterday and it took about 2.5 hours. I got out of my house cleaning duties since I had to to that so I broke even.

Now in October/Nov, I hate having a pool as I am pulling leafs twice a day unto the trees are bare.

Way too much hassle for me. :)
 
Last edited:
  • Funny
Reactions: herbu
It's called picture distortion:
before1.jpg
 
  • Like
Reactions: AcuDefTechGuy
Ok, ok, ok, so I am not a good photographer. :)



Next time I will try to lean a little to the right. :)
 
  • Funny
Reactions: KEW and herbu
ok ok ok, everyone likes the house! This is audioholics, I want more AV pics!!! :)
Well, can't install AV yet until the house is complete. ;)

Still painting the house now. After the paint, then it's the flooring.
 
Gawd, I love this place! You certainly can't carry on a conversation like this on AVS.

DJ
 
Gawd, I love this place! You certainly can't carry on a conversation like this on AVS.

DJ

You mean speak freely and respectfully among friends about anything your heart desires? :D
 
Last edited:
  • Agree
Reactions: djreef
Who ever owns that house is probably getting sick of taking all these pics :D
 
Who ever owns that house is probably getting sick of taking all these pics :D
Yeah, I am kind of tired of taking too many pictures. :D

Think I'll just wait until the house is done before taking any more. They are pouring concrete/porch/driveways on the outside and doing electrical/floor tiles on the inside at this stage.

They may install the projector screen and finishing up all A/V wirings next Friday.
 
Dang, I already built a new house, sold it and moved out while you are still building this one....

The long wait has been painful for sure.

I closed on the house loan in early February 2016. Official completion date is Dec 01, 2016. That's almost 1 freaking year! :eek:

Painful!
 

Latest posts

newsletter

  • RBHsound.com
  • BlueJeansCable.com
  • SVS Sound Subwoofers
  • Experience the Martin Logan Montis