progress
They poured the driveway and air conditioner pad.
The area for the bulkhead is covered ( because of the slope they had to bring in a lot of dirt; right side elvated about 10 feet, washing away)
Countertops are in and the frame for the marble fireplace is built.
They were laying tile ( decided on all upgraded level II tile with no carpet anywhere) so I couldn't really get in the house to take pictures--
SORRY
Grinder pump still hasn't been installed. On order 1 1/2 months now.
As one person's suggestion - bought a Shindaiwacommercial steel shaft brushtrimmer/weedeater with a 9' wood blade and will clear out the small trees in the forest.
Also plan to dam up my gully just enough to have a nice pond.
Sorry no pictures, couldn't really go into the house because they were laying the tile and hadn't grouted it yet.
Later and Peace to All,
Forest Man