progress
They poured the driveway and air conditioner pad.
The area for the bulkhead is  covered (  because of the slope they had to bring in a lot of dirt; right side elvated about 10 feet, washing away)
Countertops are  in and the frame for the marble fireplace is built.
They were laying tile ( decided on all upgraded level II tile with no carpet anywhere) so I couldn't really get in the house to take pictures-- 
SORRY
Grinder pump still hasn't been installed. On order 1 1/2 months now.
As one person's suggestion - bought a Shindaiwacommercial steel shaft brushtrimmer/weedeater with a 9' wood blade and will clear out the small trees in the forest. 
 
Also plan to dam up my gully just enough to have a nice pond. 
 Sorry no pictures
Sorry no pictures, couldn't really go into the house because they were laying the tile and hadn't grouted it yet.
Later and Peace to All,
Forest Man