10 inches is still just 10 inches.
This is an awful lot of work but Swerd and TLS say it's worthwhile.
I would have got more done today but I was dragging these things out into the light of day for picture time.
Here's that lattice.
Here's a peak at the bottom of the box. This is next in line for bracing.
It turns out that I need to stuff 100 linear inches of that brace material in there somewhere.
With the top all set it was time to separate the base and yank the ports to permanently attach the port to
the box bottom with glue and the right screws.
I don't understand why GO-NAD! thinks these ports are complicated.
It's the bracing that's kicking my @ss.
These things are getting heavier by the day. I may not need a fork lift by the time it's over but a hand truck might be in order. I wanted to be shooting primer by the end of today but I wasn't even close. I still have to make a face and trim out the base after I get the bracing squared away and the cabinet screwed and glued. Maybe by Monday.