I think at this point it would be easier to say that I could probably build another pair in somewhere between 40 and 60 hours. Another simple way to do it that would be a huge time saver would be to build the cabinets out of MDF, then fill and seal all of it and drop them off to my paint guy and have him just paint them
.
As far as cost goes, if I don't count tools at all (including router bits, sawblades, etc.) here's a breakdown...
ER18 MTM kit- $682.00
MDF- About $40.00
Cherry hardwood for the veneer- About $100
Finish supplies- About $100 (but you'll have a lot leftover for the next project)
Sandpaper and misc supplies- About $100
So, about $1000.00 give or take.
As far as other builds go, my first build was a pair of Tritrix MTM TLs. I use these in my shop and went way overboard for shop speakers as far as finishing them goes. While they don't sound as good as the ER18s, for $130ish worth of xover and speaker components they sound amazing. Everyone that heres them can't believe thats all they cost.
I also built a pair of full size Statements. Those are just MDF cabinets right now, and I'll get to finishing those in hickory after Labor day weekend.
I'm also already signed up for my next build, which is a pair of mains and a sub for our church system. I purchased the plans for those from Bill Fitzmaurice. The mains are TLAH pros, and they're basically 5' tall line arrays. Can't wait to get that done. I'll start a build thread on that whole endeavor as well. Should get the ball rolling on those as soon as the Statements are finished, and God willing those shouldn't take more than a month of my spare time cuz I have a pretty good idea already of how I'm going to do them.