We are in a rain delay. Raining like mad now and supposed to tomorrow. As long as the hole doesn't cave it shouldn't set us back too long.

Some poor guy is out there right now running the light housing.
 
He didn't seem too upset. He was right in the middle.

Pool002-1.jpg





Compared to the heat he's probably much happier in the rain.
 
Rained more this morning but we got a break from it this afternoon. It is supposed to start back up tonight or tomorrow so they got the trucks out here in a hurry to take advantage of the break. Gunite is going in!

Pool001-1.jpg


Pool005-1.jpg


Pool003-1.jpg


Pool004-1.jpg
 
  • Like
Reactions: speakEZ
Did they get a permit for you to make a mess like that...? :D

Lookin good bro... Hope it turns out as nice as you planned...
 
Thanks buddy.

It is starting to take form and we are excited. We did our final pick of materials yesterday and they ran all the electrical today. I have 7-10 days of watering the gunite and then we will be home free for a quick finish. (not counting resoding yard and new fence).

They still have to build up the center wall 6 more inches and build the retaining wall.
Pool002-3.jpg


Pool004-2.jpg
 
You have a trampoline too! Darn you, you have all the fun!:)

Maybe the next time the Dawg has Andrew over he can get him to trampoline into the pool after a few drinks and put it on youtube. That has the potential to make him internet famous..............or land up being a paraplegic.
 
Yep.

I was kind of feeling bad for my neighbor secondary to the mess and torn up yard but he is getting a new fence, new sod and a new sprinkler system on my coin so I don't feel all that bad.
I think thats Greg's poor nieghbors yard.....:D
 
We have had a few rain delays so not a lot of progress. They are back on track now and did the waterline tile today. Tomorrow they will finish the wall height and tile and install the coping. Thursday they will layout the design of the deck. If all goes well, they can pour the decking early next week and apply the Pebble Tec (plaster) later in the week.

Pool005-3.jpg
 
We have had a few rain delays so not a lot of progress. They are back on track now and did the waterline tile today. Tomorrow they will finish the wall height and tile and install the coping. Thursday they will layout the design of the deck. If all goes well, they can pour the decking early next week and apply the Pebble Tec (plaster) later in the week.

Pool005-3.jpg

It looks like it will clear up for a few days. I think I need to seriously swing by when everything is done so we can get some pics for the AH community.

If you spent this much time and effort on this you have a right to show it off.

plus that Dawg Crusher is something I do want to see.
 