The house build has progressed to the point I could make further progress this week.
The walls are primed and the wood floor in downstairs. The elevator is working but the car not complete. The siding is on. The AC was brought up last week and that makes for decent working conditions
Trimpac have delivered the trim and doors and trim out should start next week. We are waiting for the mill work. A lot of the tiling is done.
After that it is paint and the rest of the plumbing and electrical. Finally carpets and driveway.
So I had the Canadian Mid Atlantic racks delivered on Monday. I had the DAW and turntable cases taken out of storage that day also.
So this has been the progress this week.
By Monday evening.
By Tuesday evening.
Today
With the help of my 16 year old grandson we have run all the speaker wire.
We have now passed 600 ft of Belden 10 AWG speaker wire. Here are the empty 500 ft and 100 ft drums.
The number of amp channels has now increased from 14 to 18.
The wiring ready for the front three.
The left surround wire, plus rear backs and four Atmos ceiling speakers.
Wiring to the front three and front Atmos speakers.
Wiring to left surround, rear back and rear Atmos speakers.
This is the nerve center of the IT TV and FM distribution for the house including the IT connection to the generator.
I was relived to find I had got all this in the right place prior to this install! I made card board cut outs of the bases of the racks and cases and stapled them to the floor to assist in correct locations.
So that is the progress for now. The build had not progressed enough for more work on my wife's supper WAF system, but I will build the crossovers tomorrow on the kitchen table.
The front of the amp case and the trim pieces are done. I will have them professionally finished by the outfit doing the mill work.
On Monday I will paint the studio chase and then build the test equipment bay.
That will be as far as I can go until work on the house progresses further.
I will paint my main workshop after that and build it out. The anchors for the compressor and drill press were placed when the floor was poured.
I need to get this done, as the back patio and generator pad will be poured next week. I made the mounting for the outside kitchen/barbecue before I left my big shop at Benedict. I also made the mount for the generator and have test fitted it. The steel anchors and attached wood frame for the outside kitchen were placed in Sonotubes a couple of weeks ago.
I will let the concrete cure for a couple of weeks before building out the outside kitchen. I need the main workshop, as I need to fabricate the frames that support the brick around the two triple drawer units out of steel for fire code. The can be nothing flammable within 18" of the 36" grill.
Also I am going to fabricate the trim frames for the super WAF system out of aluminum. These will be spray painted to match the trim.
I can not bring in the right and left main studio speakers until the carpet is in.
We are hoping to move into the home Monday October 7. It may be tough to meet that though.
I will continue to update on a regular basis as significant progress is made.