No plumbing required.... I have a hose right by the tub to fill... thats all I need, Doesn't take that long to heat up.... I haven't run Electricity yet...
That will only take me a few hours to do... Im certified in plumbing, electricity, hydraulics, I do concrete, and plenty of side jobs with my bobcat...
Tub comes this afternoon, and then I can start on the Electricity and the rest of the deck... Tub will be sunken down into the deck about 1/2 way...
Can't wait for this mess to be over with....