This is a very good one too. This guy has construction consulting experience. Goes through the various pics during the 2018 construction analysis. The wording used in the reports (ie timely manner vs immediately). Even I can figure this stuff out by just walking down in the basement parking.
Oh that doesn't look good! Hey there's rebar sticking out! Look at that huge waterline crack! Patches only cover up the problem etc. Weird they chose to do the roof first when it was reported it didn't have any leaks. When you jackhammer the roof you have to consistently go down and monitor the supports for increased stress. Really just a sad experience.