Make sure the coax from the cable company is grounded at the point where it enters the building, or as close to that as possible. The NEC requires any communications cabling from a provider be grounded to the meter box, the breaker panel or a ground rod, as long as it meets the criteria listed. If the cable isn't grounded, call the cable company and have them take care of it. They violated the electric code and they should be the ones to fix it. Un-grounded means the shield can't be effective.