Ive read all the stuff on the hat track and green glue and 2 layers of drywall, but i just dont have the height in the basement for that i used to have 1/4 wood panel on the ceiling and a wall that was 2/3 the length of the room constructed of 2x2s and the same 1/4 wood panel,
I have since torn all the wood down and the wall and have framed the new wall up to code and ran it the full length of the room and am putting in a solid core door, i also have put up r-25 insulation i had 9" of space between the floorboards and rafters and this stuff is 8 1/4" so i know that will help, my question is should i spend the extra money and effort to put up 2 layers of 5/8 drywall on the ceiling and wall or just one, my GF usually just complains about the 15" epik Knight shaking the living room floor and other things around the house
Thanks